金坑河大桥预制T梁吊装施工技术

晓平 刘
Show Less
1 广州市市政集团有限公司, 广州市市政集团有限公司
art 2023 , 2(4), 218–220;
Published: 21 December 2023
© 2023 by the Author(s). Licensee Art and Design, USA. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution -Noncommercial 4.0 International License (CC BY-NC 4.0) ( https://creativecommons.org/licenses/by-nc/4.0/ )
Abstract

结合金坑河大桥施工实例,介绍了采用450t汽车吊吊装40.5m预制T梁的施工工艺,如场地部署、吊装顺序、吊点设置、构件临时支撑等,并对吊装设备选型进行了计算,从而确保了吊装施工的安全,可为类似工程的T梁吊装施工提供参考借鉴。

Keywords
预制T梁,吊装,吊点,临时支撑
References

[1] 周水兴,何兆益,邹毅松等.路桥施工计算手册:1 版[M].北京:人民交通出版社.2001:480-481.
[2] GB/T 20118-2006 一般用途钢丝绳[S].北京:中国标准出版社,2006.
[3] DBJ 15-31-2016 建筑地基基础设计规范[S].北京:中国建筑工业出版社,2017.

Share
Back to top
ART AND DESIGN, Print ISSN: 1672-8491, Published by Art and Design